RoHS exemptions

RoHS Annex IV exemption 33: Lead in solders on populated printed circuit boards used in Directive 93/42/EEC class IIa and IIb mobile...

Annex IV 33 covers: Lead in solders on populated printed circuit boards used in Directive 93/42/EEC class IIa and IIb mobile medical devices other than portable emergency defibrillators. Dates: Expires on 30 June 2016 for class IIa and on 31 December 2020 for class IIb.

2026-11-05Directive 2011/65/EU (RoHS), consolidated text; https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX:02011L0065-20260701

Notify me

Annex
Annex IV: Applications exempted from the restriction in Article 4(1) specific to medical devices and monitoring and control instruments
Entry
33
Section of the annex
Others
Expiry in the annex
Several dates stated: 30 June 2016, 31 December 2020
Version
Consolidated version of 1 July 2026
Official source
Directive 2011/65/EU (RoHS), consolidated text

Entry (official wording)

Lead in solders on populated printed circuit boards used in Directive 93/42/EEC class IIa and IIb mobile medical devices other than portable emergency defibrillators. Expires on 30 June 2016 for class IIa and on 31 December 2020 for class IIb.

Date wording in the entry

Expires on 30 June 2016 for class IIa and on 31 December 2020 for class IIb.

Validity and renewal

Article 5(5) of the directive: "An application for renewal of an exemption shall be made no later than 18 months before the exemption expires. The existing exemption shall remain valid until a decision on the renewal application is taken by the Commission." This site does not show whether a renewal application for this entry is pending or decided.

Article 5 of the directive sets validity periods and the renewal procedure for exemptions in Annexes III and IV. Its wording is quoted on the Sources and method page. This page repeats only what the annex says about this entry.

Neighbouring entries in Annex IV

Using Annex IV exemption 33: expiry, equipment categories, declaration

Expiry and renewal: the annex gives several dates; what each one applies to is in the dates text above: 30 June 2016 (passed); 31 December 2020 (passed). For each date that is an expiry date: Article 5(5) of the directive asks for a renewal application no later than 18 months before an exemption expires and keeps the existing exemption valid until the Commission decides on that application; under Article 5(6), a rejected renewal ends the exemption 12 to 18 months after the decision.

Whether a renewal application for this entry is pending, or the Commission has decided on it, is not recorded in the consolidated text. Directive (EU) 2025/2456 of the European Parliament and of the Council of 26 November 2025, which applies from 13 August 2027 and is not in the consolidated text of 1 July 2026, moves applications to the European Chemicals Agency and keeps the rule that the existing exemption stays valid until the Commission decides.

Amending act: in the consolidated text, the wording of this entry is marked as coming from Commission Delegated Directive 2014/13/EU of 18 October 2013.

Equipment categories: Annex IV is titled "Applications exempted from the restriction in Article 4(1) specific to medical devices and monitoring and control instruments". In Annex I of the directive these are category 8, Medical devices, and category 9, Monitoring and control instruments including industrial monitoring and control instruments.

Declaration of conformity and technical file: Article 7 of the directive has manufacturers draw up the technical documentation (point b) and an EU declaration of conformity (point c), and keep both for 10 years after the equipment is placed on the market (point d). Annex VI sets the content of the declaration; it has no line for exemptions, and its point 7 is "Additional information". The annex numbers this entry 33 in Annex IV.

Example of a line that names it, not a wording the directive prescribes: "RoHS exemption: Directive 2011/65/EU, Annex IV, 33".

Want the exemptions by expiry date?

If we publish the exemptions sorted by the expiry date the annex states, we write to you once. We use the email for nothing else.

Enter your email and tick the consent box.